MANTIN MODULAR SHORING FOR WATER TANK IN CONSTRUCTION

MANTIN MODULAR SHORING FOR WATER TANK IN CONSTRUCTION

Overview:

This project involves constructing a water tank in Jasin, Melaka, with dimensions of 14.1m (H) x 11m (L) x 11m (W). The construction is estimated to span seven months, commencing in May 2024 and concluding by December 2024. A modular scaffolding system will be utilized for the casting of concrete beams and slabs, aligning with updated regulations and project requirements.

Scope of Work:

1. Design and Drawing: Development of modular scaffolding designs optimized for beam and slab casting.
2. Calculation: Structural analysis to ensure the stability and safety of the scaffolding system during construction.
3. Material Supply: Providing high-quality modular scaffolding systems for efficient and compliant construction activities.

Open chat
Silara Akses Sdn Bhd
Hello 👋
Can we help you?