MRT_ACCESS

Access tower to underneath of MRT viaduct.

We provides design, supply and scaffold erection/dismantling for our client at MRT2 sites. This project requires combination between modular scaffold C25 and tubular scaffold due to some obstruction from existing structure at the site which require some flexible design. Cantilevered aluminium unit beam was used to support the platform which was mainly C25 scaffold. With dedicated design and team of installer, our client can rest assured that their work can be done safely and reliably.

Open chat
Silara Akses Sdn Bhd
Hello 👋
Can we help you?