PRSB BANGI TUBULAR ACCESS PLATFORM FOR MAINTENANCE
Overview:
The PRSB Bangi Access Tubular in Maintenance project involves providing tubular scaffolding for repainting the water tank located in the Bangi area. This water tank is a landmark visible from a distance, near the Petronas area, making it an important project for aesthetic maintenance. The project is expected to take between 1 to 2 months to complete, with the scaffolding system designed to provide safe access for workers to reach elevated areas for the full repainting process.
Scope of Work:
1. Design and Drawing: Custom design of the tubular scaffolding system to ensure safe access to all areas of the water tank for repainting.
2. Calculation: Structural calculations to ensure the scaffolding system can safely support maintenance workers and equipment during the repainting process.
3. Material Supply and Rental: Supplying tubular scaffolding materials on a rental basis to meet the project’s specific needs.
4. Manpower Erection and Dismantling: Providing skilled labor for the safe and efficient erection and dismantling of the scaffolding system throughout the maintenance period.